Case Studies

Commercial Wooden Play Equipment designs, manufactures and installs bespoke timber playground equipment for schools, nurseries, public parks, holiday resorts and residential developments throughout the UK.

Our projects incorporate commercial-grade timber structures, multi-play towers, climbing frames, balance trails, inclusive play features and impact-attenuating safety surfaces.

Commercial Wooden Play Equipment Installation Across Six Primary Schools

Project: Multi-site timber playground equipment installation

Customer: Alison Redshaw

Company: Redshaw Primary Education Partnership

Location: Kent, Surrey and East Sussex

Number of Schools: 6

Combined Playground Area: 4,680m²

Number of Pupils: 2,340

Project Value: £198,600

Project Duration: 30 working days

Services: Commercial wooden climbing frames, timber multi-play towers, trim trails, playground swings and safety surfacing

The Customer’s Requirements

Redshaw Primary Education Partnership required a coordinated playground improvement programme across six primary schools.

The existing outdoor play areas contained ageing equipment with limited opportunities for climbing, balancing and cooperative physical activity.

The customer wanted durable wooden playground equipment suitable for frequent use by children aged four to eleven.

Each school required a bespoke playground layout reflecting available space, pupil numbers, existing surfaces and outdoor learning requirements.

Commercial Playground Installation Programme

School LocationPlayground AreaProject Value
Maidstone820m²£34,800
Ashford760m²£31,600
Tunbridge Wells940m²£38,400
Guildford780m²£33,200
Eastbourne720m²£29,800
Lewes660m²£30,800
Total4,680m²£198,600

Individual playground designs incorporated different equipment configurations while maintaining a consistent timber specification across the educational estate.

Wooden Multi-Play Equipment Installation

Commercial Wooden Play Equipment manufactured and installed twelve timber multi-play structures across the six schools.

The equipment package incorporated:

  • Twelve timber multi-play towers
  • Eighteen elevated play platforms
  • Twelve stainless steel slides
  • Twenty-four climbing nets
  • Twelve timber connecting bridges
  • Eighteen climbing walls
  • Thirty-six ground-level activity panels
  • Twelve rope ladder access points

Equipment configurations provided a range of physical challenges suitable for different age groups.

Pressure-treated timber, reinforced rope components and corrosion-resistant fixings formed part of the equipment specification.

Timber Trim Trail Installation

Each school received a dedicated wooden trim trail incorporating graduated balancing and climbing challenges.

The combined trim trail installation extended approximately 420 linear metres across the six schools.

The equipment included:

  • Thirty-six timber balance beams
  • Seventy-two stepping posts
  • Eighteen rope traverse challenges
  • Twenty-four inclined climbing logs
  • Twelve overhead ladder structures
  • Eighteen timber stepping platforms

The equipment layouts encouraged pupils to develop balance, coordination and upper-body strength through independent and cooperative physical activity.

Playground Safety Surfacing

The surfacing programme incorporated:

  • 1,080m² of bonded rubber mulch
  • 720m² of wet pour rubber surfacing
  • 360m² of engineered wood fibre

Individual surface specifications reflected equipment free heights of fall, impact area requirements, ground conditions and accessibility considerations.

The playground designs incorporated the relevant requirements of BS EN 1176 and BS EN 1177.

Installation Coordination

Installation works were scheduled during the summer holidays to minimise disruption to educational activities.

Multiple installation teams coordinated ground preparation, equipment assembly, anchoring and surface installation across the six locations.

Each school received equipment specifications, maintenance guidance and relevant inspection documentation following completion.

The Outcome

Redshaw Primary Education Partnership received six coordinated commercial wooden playground installations.

The programme delivered:

  • Playground improvements across six primary schools
  • 4,680m² of redeveloped outdoor space
  • Twelve timber multi-play towers
  • Approximately 420 linear metres of timber trim trails
  • 2,160m² of playground safety surfacing
  • Varied physical play opportunities
  • Outdoor play facilities supporting 2,340 pupils

The complete installation programme was delivered within 30 working days and the agreed £198,600 budget.

Project Takeaway: Commercial wooden playground equipment supports primary school physical development because multi-play towers, climbing structures and balance trails provide varied challenges for children of different ages and abilities.

Bespoke Timber Adventure Playground for a Holiday Resort in North Yorkshire

Project: Large-scale wooden adventure playground design and installation

Customer: Marcus Wentworth

Company: Wentworth Country Resorts

Location: North Yorkshire

Playground Area: 2,860m²

Holiday Accommodation: 320 lodges and accommodation units

Annual Visitor Numbers: Approximately 110,000

Project Value: £168,750

Project Duration: 24 working days

Services: Bespoke wooden play equipment, adventure climbing structures, timber towers, rope bridges, playground swings and safety surfacing

The Customer’s Requirements

Wentworth Country Resorts required a commercial adventure playground to expand its family recreation facilities.

The resort’s existing playground had insufficient capacity during school holidays and peak summer trading periods.

The customer wanted a distinctive timber playground incorporating elevated climbing structures, interconnected play towers and physical challenges suitable for children of different ages.

The equipment needed to complement the surrounding countryside while accommodating intensive seasonal use.

Bespoke Adventure Playground Design

Commercial Wooden Play Equipment developed a playground layout incorporating five interconnected activity zones.

Playground ZoneArea
Main adventure climbing structure780m²
Junior timber play area460m²
Adventure balance trail540m²
Swing and slide area420m²
Circulation and family seating660m²
Total2,860m²

The layout maintained suitable equipment separation, pedestrian circulation routes and clear views from accompanying family seating areas.

Bespoke Wooden Adventure Towers

The main adventure playground incorporated a custom-designed timber multi-play structure with interconnected towers and elevated platforms.

The structure included:

  • Five interconnected timber play towers
  • Eight elevated play platforms
  • Four stainless steel slides
  • Three suspended rope bridges
  • Two enclosed crawl tunnels
  • Four inclined climbing nets
  • Three vertical climbing walls
  • Six rope ladder access points
  • Multiple ground-level sensory activity panels

The elevated structures incorporated graduated access routes and different levels of physical challenge.

Timber sections, structural connections and supporting foundations were specified according to the equipment design and anticipated commercial use.

Junior Wooden Playground Equipment

A separate junior play area incorporated equipment suitable for younger children.

The equipment package included:

  • Two low-level timber multi-play units
  • Two wooden playhouses
  • Three low-level slides
  • Eight timber stepping platforms
  • Four balancing beams
  • Six interactive activity panels
  • Two toddler swing positions

The junior equipment was positioned separately from the larger adventure structures to provide age-appropriate play opportunities.

Adventure Balance Trail and Swing Installation

A 120-linear-metre timber adventure trail connected the principal playground zones.

The trail incorporated suspended balancing beams, climbing logs, stepping posts, rope traverses and overhead challenges.

The swing area included two double timber swing frames and a separate basket swing structure.

Equipment positioning accounted for movement envelopes, impact areas and pedestrian access.

Commercial Playground Surfacing

The installation incorporated:

  • 940m² of bonded rubber mulch
  • 480m² of engineered wood fibre
  • 260m² of wet pour rubber surfacing

Natural brown and green surfacing colours complemented the timber structures and surrounding landscape.

The surface specifications reflected the individual equipment free heights of fall and required impact attenuation performance.

The Outcome

Wentworth Country Resorts received a bespoke commercial adventure playground designed for intensive visitor use.

The project delivered:

  • 2,860m² of commercial outdoor play space
  • Five dedicated activity zones
  • Five interconnected timber adventure towers
  • Eight elevated adventure play platforms
  • A 120-linear-metre timber trim trail
  • Dedicated junior playground equipment
  • Timber swing and slide installations
  • 1,680m² of playground safety surfacing

The playground installation was completed within 24 working days and the agreed £168,750 budget before the resort’s summer visitor season.

Project Takeaway: Bespoke wooden adventure playgrounds improve holiday resort recreation facilities because interconnected towers, graduated climbing challenges and separate junior play areas accommodate children of different ages within one outdoor environment.

Commercial Robinia Play Equipment Installation Across Five Public Parks

Project: Multi-site public park timber playground redevelopment

Customer: Philip Cartwright

Company: Cartwright Parks and Public Realm Services

Location: Greater Manchester, Lancashire and Merseyside

Number of Public Parks: 5

Combined Playground Area: 6,240m²

Project Value: £287,400

Project Duration: 40 working days

Services: Robinia playground equipment, commercial wooden climbing frames, timber swings, multi-play units, climbing trails and safety surfacing

The Customer’s Requirements

Cartwright Parks and Public Realm Services required improvements to five public playgrounds containing outdated timber and metal equipment.

The customer wanted naturally durable wooden play structures that complemented landscaped public spaces and accommodated regular community use.

Existing pathways, mature trees and recreational facilities needed to remain accessible wherever practical throughout the redevelopment programme.

Commercial Wooden Play Equipment developed individual playground layouts using robinia timber structures and complementary natural-coloured safety surfaces.

Public Park Playground Installation Programme

Park LocationPlayground AreaProject Value
Stockport1,420m²£64,800
Bolton1,180m²£53,600
Preston1,360m²£62,400
Southport1,240m²£58,200
St Helens1,040m²£48,400
Total6,240m²£287,400

Each playground incorporated different equipment arrangements according to available space, community requirements and existing landscape features.

Commercial Robinia Playground Equipment

The equipment specification incorporated naturally durable robinia timber for selected principal structural components.

The installation package included:

  • Ten large robinia climbing structures
  • Fifteen timber multi-play towers
  • Twenty rope climbing nets
  • Ten timber suspension bridges
  • Fifteen stainless steel slides
  • Ten double timber swing frames
  • Five basket swing structures
  • Thirty ground-level activity panels

The irregular timber profiles created a natural appearance suited to landscaped public environments.

Timber components were prepared and finished according to the equipment design specifications, with suitable connections and fixings for permanent outdoor use.

Wooden Climbing and Balancing Trails

Each park received a bespoke timber climbing and balancing trail.

The combined installation provided approximately 550 linear metres of physical activity trails.

The equipment incorporated:

  • Fifty-five timber balance beams
  • 110 timber stepping posts
  • Twenty-five rope traverse challenges
  • Thirty-five climbing log structures
  • Twenty low-level climbing platforms
  • Forty-five suspended timber stepping elements

The trail layouts accommodated different physical abilities by incorporating alternative routes and graduated equipment heights.

Public Playground Safety Surfacing

The installation programme incorporated:

Surface TypeInstalled Area
Bonded rubber mulch1,680m²
Engineered wood fibre1,240m²
Wet pour rubber960m²
Total3,880m²

Safety surface specifications were developed according to individual equipment fall heights and impact area requirements.

Existing pathways were retained where suitable, with new surface transitions installed to connect equipment areas with surrounding public spaces.

Installation and Public Access Management

Individual playground construction areas were temporarily secured to prevent public access during installation.

The programme was phased across the five parks to coordinate equipment removal, ground preparation, new equipment installation and surfacing works.

Post-installation inspection arrangements and maintenance documentation formed part of the project handover process.

The Outcome

Cartwright Parks and Public Realm Services received five redeveloped public playgrounds incorporating natural robinia timber equipment.

The project delivered:

  • 6,240m² of improved public playground space
  • Fifteen timber multi-play towers
  • Ten large robinia climbing structures
  • Approximately 550 linear metres of timber activity trails
  • Fifteen timber swing structures
  • 3,880m² of playground safety surfacing
  • Age-appropriate community play facilities
  • Consistent equipment maintenance documentation

The installation programme was completed within 40 working days and the agreed £287,400 budget.

Project Takeaway: Robinia playground equipment complements public parks because naturally durable timber and irregular structural profiles create outdoor play facilities that integrate with landscaped community environments.

Inclusive Commercial Wooden Playground for a Specialist Educational Campus in Hertfordshire

Project: Bespoke inclusive timber playground design and installation

Customer: Dr Rachel Wetherall

Company: Wetherall Specialist Education Services

Location: Hertfordshire

Playground Area: 1,920m²

Number of Pupils: 240

Project Value: £126,800

Project Duration: 20 working days

Services: Inclusive wooden play equipment, accessible multi-play units, sensory activity panels, timber playhouses, supported swings and wet pour safety surfacing

The Customer’s Requirements

Wetherall Specialist Education Services required a new outdoor play environment for pupils with additional educational, physical and sensory needs.

The existing playground provided limited accessible activities and insufficient opportunities for children requiring supported physical play.

The customer wanted wooden play equipment incorporating accessible routes, ground-level activities, transfer platforms and quieter play opportunities.

Commercial Wooden Play Equipment developed a bespoke equipment specification following consultation with the school’s management and educational support teams.

Inclusive Wooden Playground Design

The playground incorporated five distinct activity zones.

Playground ZoneArea
Accessible timber multi-play area480m²
Sensory activity area360m²
Supported swing and movement area320m²
Imaginative and quiet play area280m²
Accessible circulation routes480m²
Total1,920m²

The layout allowed pupils to move between activity zones while maintaining clear supervision routes for educational staff.

Accessible Timber Multi-Play Equipment

Commercial Wooden Play Equipment installed three bespoke timber multi-play structures incorporating accessible and supported play features.

The equipment package included:

  • Three timber multi-play units
  • Three ramp-access play platforms
  • Six low-transfer decks
  • Twelve ground-level sensory activity panels
  • Six accessible play counters
  • Three low-level slides
  • Six supported climbing access points
  • Integrated handrails and protective barriers

Ramp gradients, platform dimensions and circulation space were specified according to the intended equipment users and applicable design requirements.

Inclusive Swing and Movement Equipment

The movement area incorporated:

  • Two timber basket swing structures
  • Two supported swing positions
  • One accessible ground-level rocking play unit
  • Four low-level balancing challenges
  • Six timber stepping platforms

Equipment selection reflected the pupils’ varying physical abilities and requirements for staff assistance.

The layout maintained separation between moving equipment and adjoining pedestrian routes.

Sensory Wooden Play Equipment

The sensory play area incorporated interactive equipment offering different tactile, visual and auditory experiences.

The installation included:

  • Eighteen tactile activity panels
  • Six outdoor musical play features
  • Four accessible timber activity tables
  • Three ground-level timber playhouses
  • Eight textured timber activity features
  • Four quiet seating areas

Ground-level equipment provided opportunities for participation without requiring children to climb onto elevated structures.

Accessible Safety Surfacing Installation

The surfacing programme incorporated:

  • 840m² of wet pour rubber safety surfacing
  • 240m² of bonded rubber mulch
  • 480m² of firm connecting pathways

Wet pour rubber was selected for principal accessible equipment zones because its continuous surface supports easier movement between play activities.

The specified surface depths reflected equipment fall heights, tested critical fall height performance and the underlying construction.

The Outcome

Wetherall Specialist Education Services received a purpose-designed inclusive timber playground catering for diverse physical and sensory requirements.

The project delivered:

  • 1,920m² of inclusive outdoor play space
  • Three accessible timber multi-play structures
  • Supported swing and movement equipment
  • Eighteen tactile activity panels within the sensory zone
  • Three ground-level timber playhouses
  • Dedicated quiet play areas
  • 1,080m² of impact-attenuating safety surfacing
  • 480m² of accessible circulation routes
  • Outdoor play facilities supporting 240 pupils

The installation was completed within 20 working days and the agreed £126,800 budget.

Project Takeaway: Inclusive commercial wooden playground equipment supports participation because accessible platforms, ground-level activities and supported movement features accommodate children with different physical and sensory requirements.

Coastal Timber Playground Installation for Three Seaside Holiday Parks

Project: Commercial wooden playground equipment installation in coastal environments

Customer: Nicholas Penrose

Company: Penrose Coastal Holiday Resorts

Location: Cornwall and Devon

Number of Holiday Parks: 3

Combined Playground Area: 4,260m²

Combined Holiday Accommodation: 780 units

Project Value: £234,600

Project Duration: 30 working days

Services: Coastal wooden play equipment, themed timber multi-play towers, climbing frames, playground swings, rope bridges and safety surfacing

The Customer’s Requirements

Penrose Coastal Holiday Resorts required new commercial playground equipment across three coastal holiday parks.

Existing playground structures had experienced deterioration associated with prolonged exposure to moisture, salt air and coastal weather conditions.

The customer wanted more substantial wooden play facilities that reflected the seaside setting and accommodated increased visitor numbers during peak holiday periods.

The equipment specification needed to consider coastal exposure, material durability and ongoing maintenance requirements.

Coastal Playground Installation Programme

Holiday Park LocationPlayground AreaProject Value
Newquay1,620m²£86,400
Bude1,280m²£69,600
Ilfracombe1,360m²£78,600
Total4,260m²£234,600

Each holiday park received an individual playground design incorporating a consistent coastal timber equipment specification.

Coastal Timber Equipment Specification

Commercial Wooden Play Equipment selected materials according to the anticipated environmental exposure and equipment design requirements.

The specification incorporated:

  • Commercial-grade treated timber
  • Naturally durable timber for selected components
  • Corrosion-resistant structural fixings
  • Suitable stainless steel components
  • UV-resistant reinforced ropes
  • Protective timber end detailing
  • Drainage-conscious foundation arrangements
  • Weather-resistant activity panels

Material selection considered prolonged moisture exposure, wind conditions and the accelerated corrosion associated with coastal environments.

Themed Wooden Multi-Play Structures

Each holiday park received two bespoke coastal-themed wooden multi-play structures.

The equipment incorporated:

  • Six timber multi-play towers
  • Three ship-themed timber climbing structures
  • Twelve elevated play platforms
  • Nine stainless steel slides
  • Six suspended rope bridges
  • Twelve climbing nets
  • Nine rope access ladders
  • Eighteen themed activity panels

The ship-inspired designs incorporated elevated lookout platforms, timber decks and imaginative role-play features.

Timber Playground Swings and Adventure Equipment

The wider playground installations included:

  • Six double timber swing frames
  • Three basket swing structures
  • Twelve balancing beams
  • Thirty-six timber stepping posts
  • Twelve climbing log features
  • Six suspended rope traverse challenges
  • Six low-level timber climbing frames

Equipment arrangements provided separate activities for younger children and more challenging play opportunities for older visitors.

Playground Surfacing and Drainage

The installation programme incorporated:

Safety SurfaceInstalled Area
Bonded rubber mulch1,260m²
Wet pour rubber840m²
Engineered wood fibre480m²
Total2,580m²

Ground preparation and drainage arrangements considered local soil conditions and the potential for prolonged surface moisture.

Suitable surface transitions connected the equipment areas with existing pedestrian routes throughout each holiday park.

Installation Scheduling

Works were scheduled outside the principal summer holiday trading period.

Separate installation teams coordinated the removal of selected ageing equipment, ground preparation and new timber structure installation.

Equipment inspection and maintenance guidance included considerations relevant to coastal exposure.

The Outcome

Penrose Coastal Holiday Resorts received three bespoke coastal playground installations incorporating themed timber structures and commercial-grade equipment.

The project delivered:

  • 4,260m² of improved holiday park playground space
  • Six timber multi-play towers
  • Three ship-themed climbing structures
  • Twelve elevated play platforms
  • Nine timber swing structures
  • Dedicated junior play equipment
  • 2,580m² of playground safety surfacing
  • Material specifications suited to coastal exposure
  • Consistent maintenance guidance across all three holiday parks

The installation programme was completed within 30 working days and the agreed £234,600 budget.

Project Takeaway: Commercial wooden playground equipment can accommodate coastal environments because appropriate timber selection, corrosion-resistant fixings and suitable drainage arrangements help protect outdoor structures from prolonged environmental exposure.

Commercial Wooden Playground Equipment Across Four Residential Developments

Project: Multi-site residential playground design and installation

Customer: Daniel Stanfield

Company: Stanfield Residential and Community Developments

Location: Leicestershire, Northamptonshire, Bedfordshire and Cambridgeshire

Number of Residential Developments: 4

Combined Residential Development Size: 1,840 properties

Combined Playground Area: 5,760m²

Project Value: £312,800

Project Duration: 40 working days

Services: Commercial wooden play equipment, bespoke playground design, timber climbing frames, multi-play structures, balance trails, swings and safety surfacing

The Customer’s Requirements

Stanfield Residential and Community Developments required permanent public playground facilities across four new residential developments.

The playgrounds formed part of wider landscaped community spaces intended to serve families living within the developments.

The customer required natural-looking commercial timber equipment suitable for different age groups, with consistent material specifications across the four projects.

Individual playground layouts needed to accommodate site-specific ground conditions, planning requirements, pedestrian access and the surrounding residential environment.

Residential Playground Installation Programme

Development LocationPlayground AreaResidential PropertiesProject Value
Leicester1,680m²540£92,400
Northampton1,440m²460£78,600
Bedford1,260m²380£66,800
Peterborough1,380m²460£75,000
Total5,760m²1,840£312,800

Commercial Wooden Play Equipment coordinated individual equipment configurations according to each development’s available play space and anticipated community requirements.

Commercial Wooden Multi-Play Equipment

The installation programme incorporated twelve principal timber multi-play structures across the four developments.

The equipment package included:

  • Twelve commercial timber multi-play towers
  • Twenty-four elevated play platforms
  • Sixteen stainless steel slides
  • Twelve timber connecting bridges
  • Twenty-four rope climbing nets
  • Sixteen climbing wall elements
  • Thirty-two interactive play panels
  • Eight low-level timber playhouses

The equipment layouts created separate junior and adventure play opportunities while maintaining clear circulation routes throughout the playgrounds.

Wooden Swing and Balance Trail Installation

Each residential development received dedicated timber swing equipment and a natural balance trail.

The combined installation incorporated:

  • Eight double timber swing frames
  • Four basket swing structures
  • Eight toddler swing positions
  • Forty-eight timber balance beams
  • Ninety-six stepping posts
  • Twenty-four rope traverse challenges
  • Thirty-two climbing log structures
  • Sixteen suspended balancing elements

The installed timber trim trails provided a combined length of approximately 440 linear metres.

Playground Layout and Accessibility

The playground designs incorporated accessible circulation routes, ground-level play activities and suitable seating locations for accompanying adults.

Equipment positions considered nearby pedestrian routes, residential boundaries and existing landscaping.

Lower-level activities provided opportunities for children who preferred smaller physical challenges, while elevated structures offered more demanding climbing and balancing routes.

Commercial Playground Safety Surfacing

The installation programme incorporated:

Surface TypeInstalled Area
Bonded rubber mulch1,760m²
Wet pour rubber1,240m²
Engineered wood fibre840m²
Total3,840m²

The safety surfacing specifications reflected equipment fall heights, designated impact areas and proposed accessibility arrangements.

Natural surfacing colours complemented the timber structures and wider residential landscaping schemes.

Project Coordination and Handover

The installation programme was coordinated with the customer’s principal contractors and landscaping teams.

Equipment foundations, site levels, drainage requirements and finished surfacing were integrated with the wider development construction programmes.

Individual playgrounds received relevant equipment specifications, maintenance instructions and inspection documentation before handover.

The Outcome

Stanfield Residential and Community Developments received four coordinated commercial wooden playground installations serving its new residential communities.

The project delivered:

  • 5,760m² of commercial outdoor play space
  • Playground facilities supporting 1,840 residential properties
  • Twelve timber multi-play towers
  • Twenty-four elevated play platforms
  • Twelve principal timber swing structures
  • Approximately 440 linear metres of wooden trim trails
  • 3,840m² of playground safety surfacing
  • Age-appropriate and inclusive play opportunities
  • Consistent equipment specifications across four developments

The installation programme was completed within 40 working days and the agreed £312,800 budget.

Project Takeaway: Commercial wooden playground equipment complements residential developments because natural timber structures, varied physical activities and accessible playground layouts create shared recreational spaces for local families.

Contact Commercial Wooden Play Equipment

Commercial Wooden Play Equipment designs, manufactures and installs commercial timber climbing frames, wooden multi-play towers, adventure playground equipment, trim trails, timber swings, wooden playhouses and inclusive play structures throughout the UK.

Our team works with schools, nurseries, local authorities, holiday resorts, residential developers and commercial organisations to create bespoke outdoor play facilities tailored to individual site requirements.

Contact us today to discuss your commercial wooden playground equipment requirements.

Thank you for your interest in our services! If you have any questions, please feel free to get in touch with us using the contact form.